Proper maintenance can prolong the service life of the WQ sewage submersible pump, the following are some common maintenance methods:
1. Regularly check the inlet and outlet of the pump for foreign objects to prevent the pump from being blocked.
2. Regularly check the cable and motor insulation to ensure its safety and reliability.
3. Regularly check the seals of the pump to ensure the sealing performance of the pump.
4. Change lubricating oil and seals regularly.
5. Check the motor bearings regularly and replace them if necessary.
6. Regularly check whether the water pump body is damaged, and replace it in time if damaged.
7. Avoid running the pump dry for a long time, and avoid damage to the internal parts of the pump due to poor lubrication.
8. Regularly clean the inside and outside of the pump to avoid the accumulation of sand and dirt.
What Are the Installation Methods and Requirements of WQ Sewage Submersible Pump?
The installation method and requirements of the WQ sewage submersible pump can refer to the following aspects:
1. Installation location: WQ sewage submersible pump is suitable for installation in liquids such as wells, pools, and cesspools.
2. Installation foundation: When installing, you need to choose a solid foundation and make sure that the pump and motor are vertical.
3. Grounding: The pump needs to be connected to the grounding wire during installation to ensure the safety of the equipment.
4. Pipe connection: Connect the water inlet pipe and water outlet pipe to the pump to ensure that the connection is tight and reliable.
5. Electrical connection: Connect the cable to the motor, ensuring that the connection is tight and reliable, and at the same time complies with relevant electrical safety regulations.
6. Debugging: After the installation is completed, the pump needs to be debugged to ensure the normal operation of the equipment.
It should be noted that during the installation process, it is necessary to strictly follow the operation methods provided by the product manual or the official website, especially the electrical connection and debugging, which need to be carried out by professionals. In addition, in order to ensure the safety and performance of the equipment, it is necessary to pay attention to the selection of the appropriate model and specification and to make sufficient preparations and inspections before installation. If you encounter any problems during installation or use, please contact us in time.